top of page

Tangguh LNG Project

500tpa

Throughput

HOTROT 1509

HotRot Model

Remote Work Camps

Application

Asia/Pacific

Region

Cafeteria Waste

Waste Treated

1

Units Quantity

Remote Work Camp

Industry

Indonesia

Country

May-08

Date Installed

Bin-Lifter

Auxiliary Equipment

BP/Japanese Gas Corp.

Operator

Papua, Indonesia

Location

About the Project

The HotRot facility was installed at this remote site complete with a sorting table for inspecting waste prior to composting. Compost from the facility is used as part of growing media for local trees and shrubs to be planted for site remediation. The plant is still operating in 2026 alongside new equipment to cope with an increased workforce.

Installation HOTROT 1509 Tangguh LNG Project
Installation HOTROT 1509 Tangguh LNG Project_2
Installation HOTROT 1509 Tangguh LNG Project_3
Previous Item
AdobeStock_607852873 (Large).jpeg

Discover how HotRot can transform your waste management too.

bottom of page